PGE-INT-114207599
Sanger · Fresno County · California · Commercial
System size
813.7 kW
793.3 kW AC
Installed
2018
2018-02-02
Price / watt
$2.41/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BAP POWER CORPORATION DBA CENERGY POWER | All their sites → |
| Installer | BAP POWER CORPORATION DBA CENERGY POWER | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Suniva | OPT340-72-4-100 | 2,659 | 306.1 W |
| inverter | ABB | TRIO-20.0-TL-OUTD-S1B-US-480 (480V) | 8 | — |
| inverter | ABB | TRIO-27.6-TL-OUTD-S1B-US-480 (480V) | 22 | — |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 36.6954, -119.6409 · map
Record cadg_PGE-INT-114207599 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.