PanelCensus

PGE-INT-114206462

Clovis · Fresno County · California · Commercial

System size
49.5 kW
47.6 kW AC
Installed
2022
2022-10-14
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperSunrunAll their sites →
InstallerSunrunAll their sites →
Utility / operatorTesla Inc.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleREC SolarREC250PE218295.6 W
inverterEnphase Energy Inc.M215-60-2LL-S2X (240V)218—

Site risk

Severe-weather exposure

Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.

Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-114206462 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-114206462 — solar installation details | PanelCensus · PanelCensus