PGE-INT-114206040
Wasco · Kern County · California · Commercial
System size
129.5 kW
127.2 kW AC
Installed
2018
2018-05-11
Price / watt
$2.63/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | A-C Electric | All their sites → |
| Installer | A-C Electric | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hyundai Heavy Industries Green Energy Co. | HiS-S335RI | 426 | 305.2 W |
| inverter | Chint Power Systems America | CPS SCA36KTL-DO/US (480) [SI1] | 1 | 36 kW |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 (480) [SI1] | 2 | 50 kW |
Site risk
Severe-weather exposure
Solar sites in Kern County have been matched to an average of 2.4 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (1,877 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-114206040 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.