PGE-INT-114200510
Dublin · Alameda County · California · Utility-scale
System size
2,462.4 kW
2,410.3 kW AC
Installed
2022
2022-03-14
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Installer | Tri-Technic, Inc. | All their sites → |
| Plant operator | County of Alameda GSA | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SMA America | SC900CP-US (w/ ABB xfmr) | 2 | — |
| inverter | SMA America | SC900CP-US (w/ ABB xfmr) | 2 | — |
| inverter | SatCon Power Systems Canada | AE-375-50-F-U-04 | 1 | — |
| inverter | SatCon Power Systems Canada | AE-375-50-F-U-04 | 1 | — |
Location: 37.7259, -121.9081 · map
Record cadg_PGE-INT-114200510 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.