PGE-INT-114118371
Oakdale · Stanislaus County · California · Utility-scale
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Installer | JKB Energy | All their sites → |
| Plant operator | South San Joaquin Irr District | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSUN Eurasia Energy Systems Industry and Trade | CSUN330-72P | 6,696 | 297 W |
| inverter | SMA America | STP 50-US-41 [480V][SI1-JUN20] | 37 | — |
| inverter | SMA America | STP12000TL-US-10 (480) [SI1] | 1 | 12 kW |
Site risk
Severe-weather exposure
Solar sites in Stanislaus County have been matched to an average of 0 hail and 2.1 high-wind NOAA storm events.
Regional storm exposure by proximity (220 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 37.7817, -120.6874 · map
Record cadg_PGE-INT-114118371 from CADG · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.