PGE-INT-113524796
Lompoc · Santa Barbara County · California · Commercial
System size
26.7 kW
25.8 kW AC
Installed
2016
2016-08-09
Price / watt
$1.23/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SolarCity Corporation | All their sites → |
| Installer | SolarCity (Tesla) | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | REC Solar | REC260PE-US | 114 | 236.8 W |
| inverter | Fronius USA | Fronius Symo 10.0-3 208-240 (208V) | 1 | 9.99 kW |
| inverter | Fronius USA | Fronius Symo 12.0-3 208-240 (208V) | 1 | 12 kW |
Site risk
Severe-weather exposure
Solar sites in Santa Barbara County have been matched to an average of 0 hail and 1.5 high-wind NOAA storm events.
Regional storm exposure by proximity (196 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113524796 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.