PGE-INT-113500719
Chowchilla · Madera County · California · Commercial
System size
134.4 kW
131.8 kW AC
Installed
2016
2016-08-08
Price / watt
$2.98/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Hunter Energy Solutions | All their sites → |
| Installer | Hunter Energy Solutions | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | China Sunergy (Nanjing) | CSUN310-72P | 480 | 279.2 W |
| inverter | SolarEdge Technologies | SE20K (480V) | 6 | 20.05 kW |
Site risk
Severe-weather exposure
Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113500719 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.