PGE-INT-113497563
Dunnigan · Yolo County · California · Commercial
System size
269.8 kW
262.6 kW AC
Installed
2016
2016-12-22
Price / watt
$0.02/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BAP Power Corporation DBA Cenergy Power | All their sites → |
| Installer | BAP Power Corporation DBA Cenergy Power | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hyundai Heavy Industries | HiS-S315TI | 960 | 350.1 W |
| inverter | ABB | TRIO-27.6-TL-OUTD-S1-US-480 (480V) | 8 | — |
Site risk
Severe-weather exposure
Solar sites in Yolo County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (268 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113497563 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.