PanelCensus

PGE-INT-113458658

Clovis · Fresno County · California · Commercial

System size
472.1 kW
670.3 kW AC
Installed
2016
2016-06-02
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerSolarCity CorpAll their sites →
DeveloperSolarcityAll their sites →
InstallerSolarCity (Tesla)All their sites →
Utility / operatorTesla Inc.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleBloom EnergyES-57001—
moduleTrina SolarTSM-310PD14.181,680309.9 W
inverterBloom EnergyES-57001—
inverterFronius USAFronius Symo 24.0-3 480 (480V)1824 kW

Site risk

Severe-weather exposure

Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.

Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-113458658 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113458658 — solar installation details | PanelCensus · PanelCensus