PGE-INT-113458658
Clovis · Fresno County · California · Commercial
System size
472.1 kW
670.3 kW AC
Installed
2016
2016-06-02
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | SolarCity Corp | All their sites → |
| Developer | Solarcity | All their sites → |
| Installer | SolarCity (Tesla) | All their sites → |
| Utility / operator | Tesla Inc. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Bloom Energy | ES-5700 | 1 | — |
| module | Trina Solar | TSM-310PD14.18 | 1,680 | 309.9 W |
| inverter | Bloom Energy | ES-5700 | 1 | — |
| inverter | Fronius USA | Fronius Symo 24.0-3 480 (480V) | 18 | 24 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113458658 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.