PGE-INT-113450885
Davis · Yolo County · California · Commercial
System size
97.9 kW
96.1 kW AC
Installed
2015
2015-06-18
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | CitiGreen Inc | All their sites → |
| Installer | CitiGreen Inc | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hyundai Heavy Industries | HiS-S270TG | 408 | 240.2 W |
| inverter | Solectria Renewables | PVI 28TL-480 | 4 | — |
Site risk
Severe-weather exposure
Solar sites in Yolo County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (268 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113450885 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.