PGE-INT-113433415
Geyserville · Sonoma County · California · Commercial
System size
745.2 kW
730.3 kW AC
Installed
2016
2016-01-08
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SunWorks | All their sites → |
| Installer | SunWorks | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | Princeton Power | GTIB 480-100 | 8 | — |
| inverter | Princeton Power | GTIB 480-100 | 8 | — |
| inverter | Solectria Renewables | PVI 28TL-480 | 23 | — |
| inverter | Solectria Renewables | PVI 28TL-480 | 23 | — |
Site risk
Severe-weather exposure
Solar sites in Sonoma County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (5,408 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113433415 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.