PGE-INT-113431044
Chico · Butte County · California · Commercial
System size
216.2 kW
210.5 kW AC
Installed
2016
2016-09-07
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Chico Electric | All their sites → |
| Installer | Chico Electric | All their sites → |
| Utility / operator | Sierra Nevada Brewing Co | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | REC Solar | REC255PE | 940 | 229.8 W |
| inverter | SMA America | STP20000TL-US-10 (480V) | 10 | 20 kW |
| inverter | SMA America | STP12000TL-US-10 (480V) | 2 | 12 kW |
Site risk
Severe-weather exposure
Solar sites in Butte County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (209 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 39.7249, -121.8147 · map
Record cadg_PGE-INT-113431044 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.