PanelCensus

PGE-INT-113429155

Gustine · Merced County · California · Commercial

System size
739.8 kW
723.7 kW AC
Installed
2015
2015-07-02
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperSolarCity CorpAll their sites →
InstallerSolarCity (Tesla)All their sites →
UtilityArevon Energy, Inc.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleTrina SolarTSM-300PD142,720299.7 W
inverterSolectria RenewablesPVI 28TL-48023—

Site risk

Severe-weather exposure

Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.1219, -121.0442 · map

Record cadg_PGE-INT-113429155 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113429155 — solar installation details