PanelCensus

PGE-INT-113418784

Atwater · Merced County · California · Commercial

System size
160.1 kW
156.9 kW AC
Installed
2015
2015-08-26
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperWashington Gas Energy SystemsAll their sites →
InstallerWashington Gas Energy SystemsAll their sites →
Utility / operatorSoCore Energy LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleConergyConergy PE 260P690231.9 W
inverterSMA AmericaSTP24000TL-US-10 (480V)624 kW

Site risk

Severe-weather exposure

Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.2782, -120.6332 · map

Record cadg_PGE-INT-113418784 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113418784 — solar installation details | PanelCensus · PanelCensus