PGE-INT-113417761
Parlier · Fresno County · California · Commercial
System size
133 kW
130.1 kW AC
Installed
2015
2015-06-10
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BAP POWER CORPORATION DBA CENERGY POWER | All their sites → |
| Installer | BAP POWER CORPORATION DBA CENERGY POWER | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Jinko Solar | JKM305P-72 _ | 480 | 305.4 W |
| inverter | Solectria Renewables | PVI 28TL-480 | 4 | — |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113417761 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.