PanelCensus

PGE-INT-113372392

Santa Maria · Santa Barbara County · California · Utility-scale

System size
1,015.2 kW
996 kW AC
Installed
2014
2014-02-11
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerStellar Energy GP Inc.All their sites →
Utility / operatorSouthern California Edison Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleTalesunTP672P (300)3,760269.9 W
inverterAdvanced Energy Industries, Inc.AE 1000NX1—

Site risk

Severe-weather exposure

Solar sites in Santa Barbara County have been matched to an average of 0 hail and 1.5 high-wind NOAA storm events.

Regional storm exposure by proximity (196 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 34.9607, -120.5073 · map

Record cadg_PGE-INT-113372392 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113372392 — solar installation details | PanelCensus · PanelCensus