PanelCensus

PGE-INT-113369278

Rocklin · Placer County · California · Commercial

System size
248.6 kW
242.8 kW AC
Installed
2013
2013-10-09
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleYingli Green EnergyYL295P-35b960259.4 W
inverterAdvanced Energy Industries, Inc.AE 250NX1—

Site risk

Severe-weather exposure

Solar sites in Placer County have been matched to an average of 1.4 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (221 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-113369278 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113369278 — solar installation details | PanelCensus · PanelCensus