PGE-INT-113359202
Clovis · Fresno County · California · Commercial
System size
34 kW
34.1 kW AC
Installed
2013
2013-10-17
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | A-C Electric Company | All their sites → |
| Installer | A-C Electric Company | All their sites → |
| Utility / operator | Tesla Inc. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | SunPower Corp. | SPR-327NE-WHT-D | 98 | 327.1 W |
| module | SunPower Corp. | SPR-308E-WHT-D | 16 | 308.5 W |
| inverter | SunPower Corp. | SPR-8000m (240V) | 5 | — |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113359202 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.