PGE-INT-113354589
Danville · Contra Costa County · California · Commercial
System size
73.9 kW
70.5 kW AC
Installed
2013
2013-04-18
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SolarCity | All their sites → |
| Installer | SolarCity (Tesla) | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Trina Solar | TSM-240PA05 | 350 | 239.9 W |
| inverter | Solectria Renewables, LLC | PVI82kW-480 | 1 | — |
Record cadg_PGE-INT-113354589 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.