PGE-INT-113345969
Brentwood · Contra Costa County · California · Commercial
System size
468.9 kW
454.6 kW AC
Installed
2013
2013-09-19
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Borrego Solar Systems, Inc. | All their sites → |
| Installer | Borrego Solar Systems, Inc. | All their sites → |
| Utility / operator | CleanCapital Holdings | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Inventec Energy | IECS-6P6A-235 | 2,212 | 212 W |
| inverter | PV Powered | PVP75KW-480 | 1 | — |
| inverter | Advanced Energy Industries, Inc. | Solaron 333kW (3159000-XXXX) | 1 | — |
Location: 37.9247, -121.7525 · map
Record cadg_PGE-INT-113345969 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.