PGE-INT-113341504
Bakersfield · Kern County · California · Commercial
System size
378.1 kW
368.7 kW AC
Installed
2014
2014-10-15
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SolarCity Corporation | All their sites → |
| Installer | SolarCity (Tesla) | All their sites → |
| Utility / operator | Southern California Edison Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Trina Solar | TSM-240PA05 | 1,792 | 239.9 W |
| inverter | SMA America | STP20000TL-US-10 (480V) | 16 | 20 kW |
Site risk
Severe-weather exposure
Solar sites in Kern County have been matched to an average of 2.4 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (1,877 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113341504 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.