PanelCensus

PGE-INT-113336050

Planada · Merced County · California · Commercial

System size
159.7 kW
152.7 kW AC
Installed
2012
2012-08-22
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha SolarOneSF260-36-P285624256.4 W
inverterPV PoweredPVP75KW-2082—

Site risk

Severe-weather exposure

Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-113336050 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113336050 — solar installation details | PanelCensus · PanelCensus