PGE-INT-113333501
Fowler · Fresno County · California · Commercial
System size
43.3 kW
41.4 kW AC
Installed
2012
2012-07-13
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Morrow-Meadows Corporation | All their sites → |
| Installer | Morrow-Meadows Corporation | All their sites → |
| Utility / operator | National Raisin | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Canadian Solar | CS6P-225P | 210 | 225.1 W |
| inverter | PV Powered | PVP75KW-480 | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113333501 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.