PanelCensus

PGE-INT-113324321

Madera · Madera County · California · Commercial

System size
428.4 kW
417.9 kW AC
Installed
2012
2012-04-05
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperBAP Power CorporationAll their sites →
InstallerBAP Power CorporationAll their sites →
UtilitySouthern California Edison Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleSchuco USA LPMPE 225 PS 092,100203.8 W
inverterAdvanced Energy Industries, Inc.Solaron 500kW (3159500-XXXX)1—

Site risk

Severe-weather exposure

Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 36.9245, -120.2725 · map

Record cadg_PGE-INT-113324321 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

More solar data for this area

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113324321 — solar installation details · PanelCensus