PanelCensus

PGE-INT-113322930

Auburn · Placer County · California · Commercial

System size
81.4 kW
74.9 kW AC
Installed
2012
2012-02-22
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperClarusys Inc.All their sites →
InstallerClarusys Inc.All their sites →
Utility / operatorPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleSharp CorporationND-Q235Q2384210.9 W
inverterDirect Grid TechnologiesDGM-460192—

Site risk

Severe-weather exposure

Solar sites in Placer County have been matched to an average of 1.4 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (221 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-113322930 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113322930 — solar installation details | PanelCensus · PanelCensus