PanelCensus

PGE-INT-113321322

Corning · Tehama County · California · Commercial

System size
29.5 kW
28.3 kW AC
Installed
2011
2011-01-25
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleSuntech Power, Inc.STP210-18/Ub-1156185.9 W
inverterSMA AmericaSB7000US (277V)4—

Site risk

Severe-weather exposure

Solar sites in Tehama County have been matched to an average of 2.7 hail and 0.3 high-wind NOAA storm events.

Regional storm exposure by proximity (192 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-113321322 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113321322 — solar installation details | PanelCensus · PanelCensus