PanelCensus

PGE-INT-113291198

Clovis · Fresno County · California · Commercial

System size
30.4 kW
28.1 kW AC
Installed
2007
2007-04-20
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperUnlimited EnergyAll their sites →
InstallerUnlimited EnergyAll their sites →
Utility / operatorTesla Inc.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleSharp CorporationNE-170U1204147.1 W
inverterSatCon Power Systems CanadaAE-30-60-PV-D1—

Site risk

Severe-weather exposure

Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.

Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-113291198 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-113291198 — solar installation details | PanelCensus · PanelCensus