PGE-INT-113290201
Chowchilla · Madera County · California · Commercial
System size
41.1 kW
39.2 kW AC
Installed
2014
2014-05-05
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | REC Solar | All their sites → |
| Installer | REC Solar | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Mitsubishi Electric | PV-MF180UD4 | 153 | 180.3 W |
| module | REC Solar | REC225PE-US | 84 | 488.1 W |
| inverter | SMA America | SB6000U (240V) | 5 | — |
| inverter | Power-One | PVI-6000-OUTD-US (240 V) | 3 | 6 kW |
Site risk
Severe-weather exposure
Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113290201 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.