PGE-INT-113287789
Napa · Napa County · California · Commercial
System size
172.7 kW
163.1 kW AC
Installed
2007
2007-08-13
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Premier Power | All their sites → |
| Installer | Premier Power | All their sites → |
| Utility / operator | Soscol Ferry Solar | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | General Electric | GEPVp-200-M | 970 | 199.4 W |
| inverter | Fronius | IG 5100 | 32 | — |
| inverter | Fronius | IG2000 | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Napa County have been matched to an average of 0 hail and 1.9 high-wind NOAA storm events.
Regional storm exposure by proximity (154 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-113287789 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.