PanelCensus

PGE-INT-112880955

Coalinga · Fresno County · California · Utility-scale

System size
3,917.5 kW
3,836.9 kW AC
Installed
2023
2023-12-27
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerForeFront PowerAll their sites →
InstallerForeFront PowerAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterSMA AmericaSC500CP-US3—
inverterChint Power Systems AmericaCPS SCA36KTL-DO/US (480V)1036 kW
inverterChint Power Systems AmericaCPS SCA36KTL-DO/US (480V)1036 kW
inverterChint Power Systems AmericaCPS SCA50KTL-DO/US-480 (480V)1250 kW
inverterSMA AmericaSC720CP-US3—
inverterSMA AmericaSC500CP-US3—
inverterSMA AmericaSC720CP-US3—
inverterChint Power Systems AmericaCPS SCA60KTL-DO/US-480 (480V)1860 kW
inverterChint Power Systems AmericaCPS SCA60KTL-DO/US-480 (480V)1860 kW
inverterChint Power Systems AmericaCPS SCA50KTL-DO/US-480 (480V)1250 kW

Site risk

Severe-weather exposure

Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.

Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 36.1267, -120.2432 · map

Record cadg_PGE-INT-112880955 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-112880955 — solar installation details | PanelCensus · PanelCensus