PanelCensus

PGE-INT-110850939

Alameda County · California · Utility-scale

System size
1,071.9 kW
1,055.5 kW AC
Installed
2017
2017-03-16
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerBorrego Solar Systems Inc.All their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleLG ElectronicsLG360N2W-B33,258360.6 W
inverterSungrow Power SupplySG60KU-M1560 kW

Record cadg_PGE-INT-110850939 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.