PanelCensus

Utility / plant operator

PUD NO 2 OF GRANT COUNTY

6 recorded solar installations interconnected by PUD NO 2 OF GRANT COUNTY — mostly in Washington.

At a glance

PUD NO 2 OF GRANT COUNTY is a utility or plant operator with 6 recorded solar installations interconnected, totalling 27.6 MW (as reported), dated 2017 to 2024. All of its located records are in Washington.

Dataset updated . Sources: LBNL Tracking the Sun + permits + state programs + USGS/EIA utility-scale.

Installations interconnected
6
Total capacity
27.6 MW
as reported
States
1
Median size
4,497 kW
Median $/W
—
pre-incentive
Third-party owned
0%
lease / PPA

Growth

Installations by year

2017
1
2018
1
2022
2
2024
2

Latest records

Most recent recorded installs

DateLocationSize$/WSegment
Apr 1, 2024WA4,828 kW—UTILITY
Apr 1, 2024WA9,873 kW—UTILITY
Jul 1, 2022WA541 kW—COM
Jan 1, 2022WA648 kW—COM
Jul 1, 2018WA7,498 kW—UTILITY
Oct 1, 2017WA4,166 kW—UTILITY

Service geography

How does PUD NO 2 OF GRANT COUNTY compare with other utilities & plant operators?

Its median system is 4,497 kW, about 661 times the median of 6.8 kW for all recorded installations. Utilities & plant operators with similar recorded volume include Sacramento Municipal Util Dist (56,197), San Diego Gas & Electric Co. (52,118) and Potomac Electric Power Co (40,361).

How has PUD NO 2 OF GRANT COUNTY's installation volume changed?

The earliest dated installation interconnected by PUD NO 2 OF GRANT COUNTY is from 2017. The busiest year on record is 2022, with 2 installations. 2024 has 2 recorded installations. The most recent dated record is from Apr 1, 2024.

Where are PUD NO 2 OF GRANT COUNTY's solar installations?

All of its located installations are in Washington.

Frequently asked questions

How many solar installations has PUD NO 2 OF GRANT COUNTY interconnected?

PanelCensus records 6 installations interconnected by PUD NO 2 OF GRANT COUNTY, from Oct 1, 2017 to Apr 1, 2024, totalling 27.6 MW of capacity across 1 state. Coverage varies by state, so actual totals may be higher.

Where does PUD NO 2 OF GRANT COUNTY operate?

Most recorded activity is in Washington (6).

How large are PUD NO 2 OF GRANT COUNTY's solar installations?

The median recorded installation is 4,497 kW, against 6.8 kW for all recorded installations; total recorded capacity is 27.6 MW.

When was PUD NO 2 OF GRANT COUNTY's most recent recorded solar installation?

The latest dated record is from Apr 1, 2024. Public registers report with a lag, so newer installations may not appear yet.

Why does PUD NO 2 OF GRANT COUNTY appear on rooftop solar records?

On distributed (rooftop and commercial) records the operator field names the utility the system interconnects with; on utility-scale plants it names the plant operator. PUD NO 2 OF GRANT COUNTY's profile counts both.

Related utilities & plant operators and places

About this data

Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published October 19, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.

Cite as: PanelCensus, “PUD NO 2 OF GRANT COUNTY, utility / plant operator”, https://panelcensus.com/operators/pud-no-2-of-grant-county-376 (data as of October 19, 2026).