Utility / plant operator
Kandiyohi Power Cooperative
8 recorded solar installations interconnected by Kandiyohi Power Cooperative — mostly in Minnesota.
At a glance
Kandiyohi Power Cooperative is a utility or plant operator with 8 recorded solar installations interconnected, totalling 308 kW (as reported), dated 2019 to 2024. All of its located records are in Minnesota.
Dataset updated . Sources: LBNL Tracking the Sun + permits + state programs + USGS/EIA utility-scale.
Growth
Installations by year
Latest records
Most recent recorded installs
| Date | Location | Size | $/W | Segment |
|---|---|---|---|---|
| Jan 1, 2024 | New London, MN | 40 kW | $4.06/W | COM |
| Jan 1, 2024 | New London, MN | 40 kW | $4.06/W | COM |
| Jan 1, 2024 | New London, MN | 40 kW | $4.06/W | COM |
| Jan 1, 2022 | Raymond, MN | 38.5 kW | $3.50/W | COM |
| Jan 1, 2022 | Pennock, MN | 38.5 kW | $4.74/W | COM |
| Jan 1, 2021 | Belgrade, MN | 38.4 kW | $3.26/W | COM |
| Jan 1, 2020 | Willmar, MN | 33.3 kW | $4.31/W | COM |
| Jan 1, 2019 | Willmar, MN | 39.2 kW | $5.00/W | COM |
Service geography
How does Kandiyohi Power Cooperative compare with other utilities & plant operators?
Its median system is 38.9 kW, about 5.7 times the median of 6.8 kW for all recorded installations. Utilities & plant operators with similar recorded volume include Sacramento Municipal Util Dist (56,197), San Diego Gas & Electric Co. (52,118) and Potomac Electric Power Co (40,361).
How has Kandiyohi Power Cooperative's installation volume changed?
The earliest dated installation interconnected by Kandiyohi Power Cooperative is from 2019. The busiest year on record is 2024, with 3 installations. The most recent dated record is from Jan 1, 2024.
Where are Kandiyohi Power Cooperative's solar installations?
All of its located installations are in Minnesota. The places with the most records are New London, MN (3), Willmar, MN (2), Pennock, MN (1), Raymond, MN (1) and Belgrade, MN (1).
Frequently asked questions
How many solar installations has Kandiyohi Power Cooperative interconnected?
PanelCensus records 8 installations interconnected by Kandiyohi Power Cooperative, from Jan 1, 2019 to Jan 1, 2024, totalling 308 kW of capacity across 1 state. Coverage varies by state, so actual totals may be higher.
Where does Kandiyohi Power Cooperative operate?
Most recorded activity is in Minnesota (8).
How large are Kandiyohi Power Cooperative's solar installations?
The median recorded installation is 38.9 kW, against 6.8 kW for all recorded installations; total recorded capacity is 308 kW.
When was Kandiyohi Power Cooperative's most recent recorded solar installation?
The latest dated record is from Jan 1, 2024. Public registers report with a lag, so newer installations may not appear yet.
Why does Kandiyohi Power Cooperative appear on rooftop solar records?
On distributed (rooftop and commercial) records the operator field names the utility the system interconnects with; on utility-scale plants it names the plant operator. Kandiyohi Power Cooperative's profile counts both.
Related utilities & plant operators and places
- All utilities & plant operators· 191 profiles
- Solar in Minnesota· 8 interconnected by Kandiyohi Power Cooperative
- Sacramento Municipal Util Dist· 56,197 installations
- San Diego Gas & Electric Co.· 52,118 installations
- Potomac Electric Power Co· 40,361 installations
- Pacific Gas & Electric Co.· 31,251 installations
- Baltimore Gas & Electric Co· 27,272 installations
- CONSOLIDATED EDISON CO-NY INC· 26,655 installations
About this data
Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published October 19, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.
Cite as: PanelCensus, “Kandiyohi Power Cooperative, utility / plant operator”, https://panelcensus.com/operators/kandiyohi-power-cooperative-222 (data as of October 19, 2026).