PanelCensus

Utility / plant operator

Gilead Sciences Inc. Foster City

5 recorded solar installations interconnected by Gilead Sciences Inc. Foster City — mostly in California.

At a glance

Gilead Sciences Inc. Foster City is a utility or plant operator with 5 recorded solar installations interconnected, totalling 1.5 MW (as reported), dated 2013 to 2025. All of its located records are in California.

Dataset updated . Sources: LBNL Tracking the Sun + permits + state programs + USGS/EIA utility-scale.

Installations interconnected
5
Total capacity
1.5 MW
as reported
States
1
Median size
76.6 kW
Median $/W
$11.13/W
pre-incentive
Third-party owned
0%
lease / PPA

Growth

Installations by year

2013
1
2021
1
2024
1
2025
2

Latest records

Most recent recorded installs

DateLocationSize$/WSegment
Jan 24, 2025Foster City, CA77.6 kW$11.13/WCOM
Jan 24, 2025Foster City, CA59.1 kW$14.63/WCOM
Dec 11, 2024Foster City, CA76.6 kW$2.87/WCOM
Jan 1, 2021Foster City, CA1,300 kW$3.60/WUTILITY
Apr 9, 2013Foster City, CA26.3 kW—COM

Service geography

How does Gilead Sciences Inc. Foster City compare with other utilities & plant operators?

Its median system is 76.6 kW, about 11 times the median of 6.8 kW for all recorded installations. Utilities & plant operators with similar recorded volume include Sacramento Municipal Util Dist (56,197), San Diego Gas & Electric Co. (52,118) and Potomac Electric Power Co (40,361).

How has Gilead Sciences Inc. Foster City's installation volume changed?

The earliest dated installation interconnected by Gilead Sciences Inc. Foster City is from 2013. The busiest year on record is 2025, with 2 installations. The most recent dated record is from Jan 24, 2025.

Where are Gilead Sciences Inc. Foster City's solar installations?

All of its located installations are in California. The places with the most records are Foster City, CA (5).

Frequently asked questions

How many solar installations has Gilead Sciences Inc. Foster City interconnected?

PanelCensus records 5 installations interconnected by Gilead Sciences Inc. Foster City, from Apr 9, 2013 to Jan 24, 2025, totalling 1.5 MW of capacity across 1 state. Coverage varies by state, so actual totals may be higher.

Where does Gilead Sciences Inc. Foster City operate?

Most recorded activity is in California (5).

How large are Gilead Sciences Inc. Foster City's solar installations?

The median recorded installation is 76.6 kW, against 6.8 kW for all recorded installations; total recorded capacity is 1.5 MW.

When was Gilead Sciences Inc. Foster City's most recent recorded solar installation?

The latest dated record is from Jan 24, 2025. Public registers report with a lag, so newer installations may not appear yet.

Why does Gilead Sciences Inc. Foster City appear on rooftop solar records?

On distributed (rooftop and commercial) records the operator field names the utility the system interconnects with; on utility-scale plants it names the plant operator. Gilead Sciences Inc. Foster City's profile counts both.

Related utilities & plant operators and places

About this data

Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published October 10, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.

Cite as: PanelCensus, “Gilead Sciences Inc. Foster City, utility / plant operator”, https://panelcensus.com/operators/gilead-sciences-inc-foster-city-584 (data as of October 10, 2026).