Utility / plant operator
Claverack Rural Elec Coop Inc
11 recorded solar installations interconnected by Claverack Rural Elec Coop Inc — mostly in Pennsylvania.
At a glance
Claverack Rural Elec Coop Inc is a utility or plant operator with 11 recorded solar installations interconnected, totalling 515 kW (as reported), dated 2010 to 2025. All of its located records are in Pennsylvania.
Dataset updated . Sources: LBNL Tracking the Sun + permits + state programs + USGS/EIA utility-scale.
Growth
Installations by year
Latest records
Most recent recorded installs
| Date | Location | Size | $/W | Segment |
|---|---|---|---|---|
| Jan 5, 2026 | PA | 33.9 kW | — | COM |
| Jan 25, 2025 | PA | 61.9 kW | — | COM |
| May 3, 2024 | PA | 54.7 kW | — | COM |
| Jan 19, 2024 | PA | 50.2 kW | — | COM |
| Aug 30, 2023 | PA | 32 kW | — | COM |
| Jun 19, 2023 | PA | 31.2 kW | — | COM |
| Feb 7, 2023 | PA | 25.9 kW | — | COM |
| Apr 6, 2021 | PA | 70.4 kW | — | COM |
| Mar 26, 2021 | PA | 74.4 kW | — | COM |
| Apr 28, 2011 | PA | 29.1 kW | — | COM |
See all 11 installations →searchable & filterable; export to CSV with a free account
Service geography
How does Claverack Rural Elec Coop Inc compare with other utilities & plant operators?
Its median system is 50.2 kW, about 7.4 times the median of 6.8 kW for all recorded installations. Utilities & plant operators with similar recorded volume include Sacramento Municipal Util Dist (56,197), San Diego Gas & Electric Co. (52,118) and Potomac Electric Power Co (40,361).
How has Claverack Rural Elec Coop Inc's installation volume changed?
The earliest dated installation interconnected by Claverack Rural Elec Coop Inc is from 2010. The busiest year on record is 2023, with 3 installations. 2025 has 1 recorded installation. The most recent dated record is from Jan 5, 2026.
Where are Claverack Rural Elec Coop Inc's solar installations?
All of its located installations are in Pennsylvania.
Frequently asked questions
How many solar installations has Claverack Rural Elec Coop Inc interconnected?
PanelCensus records 11 installations interconnected by Claverack Rural Elec Coop Inc, from Mar 29, 2010 to Jan 5, 2026, totalling 515 kW of capacity across 1 state. Coverage varies by state, so actual totals may be higher.
Where does Claverack Rural Elec Coop Inc operate?
Most recorded activity is in Pennsylvania (11).
How large are Claverack Rural Elec Coop Inc's solar installations?
The median recorded installation is 50.2 kW, against 6.8 kW for all recorded installations; total recorded capacity is 515 kW.
When was Claverack Rural Elec Coop Inc's most recent recorded solar installation?
The latest dated record is from Jan 5, 2026. Public registers report with a lag, so newer installations may not appear yet.
Why does Claverack Rural Elec Coop Inc appear on rooftop solar records?
On distributed (rooftop and commercial) records the operator field names the utility the system interconnects with; on utility-scale plants it names the plant operator. Claverack Rural Elec Coop Inc's profile counts both.
Related utilities & plant operators and places
- All utilities & plant operators· 191 profiles
- Solar in Pennsylvania· 11 interconnected by Claverack Rural Elec Coop Inc
- Sacramento Municipal Util Dist· 56,197 installations
- San Diego Gas & Electric Co.· 52,118 installations
- Potomac Electric Power Co· 40,361 installations
- Pacific Gas & Electric Co.· 31,251 installations
- Baltimore Gas & Electric Co· 27,272 installations
- CONSOLIDATED EDISON CO-NY INC· 26,655 installations
About this data
Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published October 19, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.
Cite as: PanelCensus, “Claverack Rural Elec Coop Inc, utility / plant operator”, https://panelcensus.com/operators/claverack-rural-elec-coop-inc-91 (data as of October 19, 2026).