Utility / plant operator
Bullrock-NxtGenREA
5 recorded solar installations interconnected by Bullrock-NxtGenREA — mostly in New York.
At a glance
Bullrock-NxtGenREA is a utility or plant operator with 5 recorded solar installations interconnected, totalling 20.0 MW (as reported), dated 2024 to 2025. All of its located records are in New York.
Dataset updated . Sources: LBNL Tracking the Sun + permits + state programs + USGS/EIA utility-scale.
Growth
Installations by year
Latest records
Most recent recorded installs
| Date | Location | Size | $/W | Segment |
|---|---|---|---|---|
| Apr 1, 2025 | NY | 3,300 kW | — | UTILITY |
| Dec 1, 2024 | Newark, NY | 3,000 kW | — | UTILITY |
| Oct 1, 2024 | Alfred, NY | 6,400 kW | — | UTILITY |
| Sep 1, 2024 | Kirkland, NY | 4,200 kW | — | UTILITY |
| Sep 1, 2024 | Hanover, NY | 3,100 kW | — | UTILITY |
Service geography
How does Bullrock-NxtGenREA compare with other utilities & plant operators?
Its median system is 3,300 kW, about 485 times the median of 6.8 kW for all recorded installations. Utilities & plant operators with similar recorded volume include Sacramento Municipal Util Dist (56,197), San Diego Gas & Electric Co. (52,118) and Potomac Electric Power Co (40,361).
How has Bullrock-NxtGenREA's installation volume changed?
The earliest dated installation interconnected by Bullrock-NxtGenREA is from 2024. The busiest year on record is 2024, with 4 installations. 2025 has 1 recorded installation. The most recent dated record is from Apr 1, 2025.
Where are Bullrock-NxtGenREA's solar installations?
All of its located installations are in New York. The places with the most records are Alfred, NY (1), Hanover, NY (1), Kirkland, NY (1) and Newark, NY (1).
Frequently asked questions
How many solar installations has Bullrock-NxtGenREA interconnected?
PanelCensus records 5 installations interconnected by Bullrock-NxtGenREA, from Sep 1, 2024 to Apr 1, 2025, totalling 20.0 MW of capacity across 1 state. Coverage varies by state, so actual totals may be higher.
Where does Bullrock-NxtGenREA operate?
Most recorded activity is in New York (5).
How large are Bullrock-NxtGenREA's solar installations?
The median recorded installation is 3,300 kW, against 6.8 kW for all recorded installations; total recorded capacity is 20.0 MW.
When was Bullrock-NxtGenREA's most recent recorded solar installation?
The latest dated record is from Apr 1, 2025. Public registers report with a lag, so newer installations may not appear yet.
Why does Bullrock-NxtGenREA appear on rooftop solar records?
On distributed (rooftop and commercial) records the operator field names the utility the system interconnects with; on utility-scale plants it names the plant operator. Bullrock-NxtGenREA's profile counts both.
Related utilities & plant operators and places
- All utilities & plant operators· 191 profiles
- Solar in New York· 5 interconnected by Bullrock-NxtGenREA
- Sacramento Municipal Util Dist· 56,197 installations
- San Diego Gas & Electric Co.· 52,118 installations
- Potomac Electric Power Co· 40,361 installations
- Pacific Gas & Electric Co.· 31,251 installations
- Baltimore Gas & Electric Co· 27,272 installations
- CONSOLIDATED EDISON CO-NY INC· 26,655 installations
About this data
Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published October 19, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.
Cite as: PanelCensus, “Bullrock-NxtGenREA, utility / plant operator”, https://panelcensus.com/operators/bullrock-nxtgenrea-52 (data as of October 19, 2026).