PanelCensus

Advanced Power

No recent records

Solar installer based in Texas · active in 2 states · installer record #440 resolved from 9 public installation records.

At a glance

Advanced Power is a solar installer with 9 recorded installations totalling 55 kW, dated 2011 to 2013. Its records are concentrated in Texas (89%), where it ranks 335th of 448 profiled installers by volume and 7,595th of 10,536 nationally.

Recorded installs
9
Total capacity
55 kW
DC nameplate
Median system
6.8 kW
≈ $19,563
Median price
$3.10/W
pre-incentive
Third-party owned
0%
lease / PPA
Battery attach
0%
First recorded
2011
Last recorded
2013

Track record

Install volume by year

2011
1$5.94/W
2012
4$3.01/W
2013
4$3.24/W

Bars: recorded installs · right column: this installer's median $/W that year.

Latest records

Most recent recorded installs

DateLocationSizePriceOwnership
Oct 3, 2013TX—$10,000Host-owned
Jun 13, 2013TX7 kW$22,704Host-owned
May 10, 2013TX6.5 kW$18,396Host-owned
Apr 5, 2013TX7 kW$24,468Host-owned
Nov 29, 2012TX6.4 kW$20,296Host-owned
Nov 26, 2012TX7 kW$10,882Host-owned
Sep 27, 2012TX6.2 kW$18,831Host-owned
Sep 6, 2012TX6.2 kW$18,750Host-owned
Sep 21, 2011Laguna Beach, CA8.6 kW$51,300Host-owned

Service geography

Busiest cities

Laguna Beach, CA 1

Record

Installer ID
PC-440
First recorded install
Sep 21, 2011
Last recorded install
Oct 3, 2013
Priced records
8

Is this your company?

Installers will be able to claim this profile, correct records and add licensing, NABCEP credentials and service details. Create a free account to be ready when claims open.

How does Advanced Power compare with other installers in Texas?

By recorded installations Advanced Power ranks 335th among the 448 installers based in Texas with five or more records. Its median system, 6.8 kW, is about 25% below the state median of 9 kW. 0% include battery storage, compared with 11% of Texas records. Installers of similar recorded volume in Texas include Solar Zero (10), WELLS SOLAR ELECTRICAL SERVICES 1209 STURGEON CT , ARLINGTON, TX 76001 (512) 382-7956 (10) and Maverick Solar Enterprises (10).

How has Advanced Power's installation volume changed?

Advanced Power's earliest dated installation on record is from 2011. It has recorded installations in 3 calendar years. The busiest year was 2012, with 4 installations. 2013, its latest year with records, has 4. Its median price per watt moved from $5.94/W in 2011 to $3.24/W in 2013. The most recent recorded installation is dated Oct 3, 2013. No installation in the public records is dated within the last three years.

Where does Advanced Power install solar?

Recorded installations span 2 states: Texas (8, 89%) and California (1, 11%). The cities with the most of its installations are Laguna Beach, CA (1).

Frequently asked questions

How many solar installations has Advanced Power completed?

PanelCensus records 9 installations by Advanced Power, from Sep 21, 2011 to Oct 3, 2013, totalling 55 kW of capacity. Public reporting varies by state, so the company's true total may be higher.

What does Advanced Power charge for solar?

The median installed price across 8 priced systems is $3.10/W before incentives (median system 6.8 kW, about $19,563). The Texas median is $3.89/W.

Where does Advanced Power install solar?

Recorded installs span 2 states, led by Texas (8) and California (1). Its busiest city is Laguna Beach, CA.

Is Advanced Power still installing solar?

The most recent installation attributed to Advanced Power in the public records is dated Oct 3, 2013; 2013 has 4 recorded installations. Records reach PanelCensus months to a couple of years after installation, so recent activity may not appear yet.

Does Advanced Power install battery storage?

0 recorded installations by Advanced Power (0%) include a battery.

Related installers and places

Dataset updated . Sources: LBNL Tracking the Sun + permit and program records; installer resolved by exact-normalized name matching.

About this data

Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published September 21, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.

Cite as: PanelCensus, “Advanced Power, solar installer (Texas)”, https://panelcensus.com/installers/texas/advanced-power-440 (data as of September 21, 2026).