PanelCensus

Emerald Green Engineering

No recent records

Solar installer based in California · installer record #4200 resolved from 7 public installation records.

At a glance

Emerald Green Engineering is a solar installer with 7 recorded installations totalling 48 kW, dated 2012 to 2013. All of its records are in California, where it ranks 5030th of 6,220 profiled installers by volume and 8,491st of 10,536 nationally.

Recorded installs
7
Total capacity
48 kW
DC nameplate
Median system
6.4 kW
≈ $28,940
Median price
$3.66/W
pre-incentive
Third-party owned
100%
lease / PPA
Battery attach
0%
First recorded
2012
Last recorded
2013

Track record

Install volume by year

2012
4$3.89/W
2013
3$3.66/W

Bars: recorded installs · right column: this installer's median $/W that year.

Latest records

Most recent recorded installs

DateLocationSizePriceOwnership
Apr 25, 2013Fontana, CA7 kW$33,089Third-party
Feb 22, 2013La Mesa, CA11.5 kW$41,236Third-party
Jan 9, 2013San Diego, CA4.5 kW$16,481Third-party
Nov 8, 2012Carlsbad, CA5.9 kW$20,951Third-party
Nov 8, 2012San Marcos, CA5.9 kW$20,246Third-party
Jul 30, 2012Chula Vista, CA6.4 kW$30,969Third-party
Jun 19, 2012Poway, CA6.9 kW$28,940Third-party

Service geography

Busiest cities

Carlsbad, CA 1Poway, CA 1San Diego, CA 1La Mesa, CA 1Fontana, CA 1San Marcos, CA 1Chula Vista, CA 1

Record

Installer ID
PC-4200
First recorded install
Jun 19, 2012
Last recorded install
Apr 25, 2013
Priced records
7

Is this your company?

Installers will be able to claim this profile, correct records and add licensing, NABCEP credentials and service details. Create a free account to be ready when claims open.

How does Emerald Green Engineering compare with other installers in California?

By recorded installations Emerald Green Engineering ranks 5030th among the 6,220 installers based in California with five or more records. Its median system, 6.4 kW, is roughly in line with the state median of 5.9 kW. 100% of its recorded installations are third-party owned (lease or power-purchase agreement), against 29% across California. 0% include battery storage, compared with 16% of California records. Installers of similar recorded volume in California include Eclectic Electric (7), Eco State Development (7) and Edisun Renewables (7).

How has Emerald Green Engineering's installation volume changed?

Emerald Green Engineering's earliest dated installation on record is from 2012. It has recorded installations in 2 calendar years. The busiest year was 2012, with 4 installations. 2013, its latest year with records, has 3. Its median price per watt moved from $3.89/W in 2012 to $3.66/W in 2013. The most recent recorded installation is dated Apr 25, 2013. No installation in the public records is dated within the last three years.

Where does Emerald Green Engineering install solar?

All recorded installations are in California. The cities with the most of its installations are Carlsbad, CA (1), Poway, CA (1), San Diego, CA (1), La Mesa, CA (1) and Fontana, CA (1).

Frequently asked questions

How many solar installations has Emerald Green Engineering completed?

PanelCensus records 7 installations by Emerald Green Engineering, from Jun 19, 2012 to Apr 25, 2013, totalling 48 kW of capacity. Public reporting varies by state, so the company's true total may be higher.

What does Emerald Green Engineering charge for solar?

The median installed price across 7 priced systems is $3.66/W before incentives (median system 6.4 kW, about $28,940). The California median is $4.26/W.

Where does Emerald Green Engineering install solar?

All 7 recorded installations are in California, the most of them in Carlsbad.

Is Emerald Green Engineering still installing solar?

The most recent installation attributed to Emerald Green Engineering in the public records is dated Apr 25, 2013; 2013 has 3 recorded installations. Records reach PanelCensus months to a couple of years after installation, so recent activity may not appear yet.

Does Emerald Green Engineering install leased or PPA solar systems?

7 recorded installations by Emerald Green Engineering (100%) are third-party owned — a lease or power-purchase agreement; across California the share is 29%.

Does Emerald Green Engineering install battery storage?

0 recorded installations by Emerald Green Engineering (0%) include a battery.

Related installers and places

Dataset updated . Sources: LBNL Tracking the Sun + permit and program records; installer resolved by exact-normalized name matching.

About this data

Source: Lawrence Berkeley National Laboratory's Tracking the Sun, merged with city permit records, state incentive programs and the USGS U.S. Large-Scale Solar Photovoltaic Database / EIA-860 plant registers, as published September 21, 2026 — PanelCensus refreshes it as each source publishes new records. See the methodology for how records are matched, cleaned and scored.

Cite as: PanelCensus, “Emerald Green Engineering, solar installer (California)”, https://panelcensus.com/installers/california/emerald-green-engineering-4200 (data as of September 21, 2026).